Measure distance between two survey stations using chain, tape and ranging rods when two stations are inter visible. Taking offset by chaining.
Determine area of open fields using chain and cross staff survey.
Undertake simple levelling using Dumpy level/ Tilting level or Automatic level.
Undertake differential levelling and determine Reduced Levels by Height of Instrument method and Rise & Fall method using Dumpy level/ Auto level and levelling staff.
Undertake fly levelling with double check using Dumpy level/Auto level and levelling.
Undertake survey project with Levelling instrument for Profile levelling and cross sectioning of a road.
Plot the L-section with minimum 3- cross sections on Al size imperial sheet for data collected in the survey project mentioned at Practical No. 6.
Use Transit Theodolite to measure Horizontal and Vertical angle by Direct Method.
Plot the traverse on Al size imperial drawing sheet for the collected data in the survey project mentioned at Practical No. 8.
Undertake survey project for plotting contour map for a given area by method of gridding.
Plot the contours for data collected in the survey project mentioned at Practical No. 10.